Solar costsNorthern Ireland2026 prices
How Much Do Solar Panels Cost in Northern Ireland? (2026 Prices)
A typical 4.6kW solar system costs £4,350 installed in Northern Ireland in 2026, with 0% VAT. Add a 10kWh battery and most homes land between £6,700 and £7,600. Here is what sits behind those numbers, what moves them, and what a real NI home gets back.

The short answer
- 4.6kW to 5.4kW, panels only: £4,350 to £4,750 installed.
- 4.6kW to 7.3kW with a 10kWh battery: £6,700 to £7,600, depending on system size.
- VAT: 0% on domestic solar and batteries in Northern Ireland until 31 March 2027.
- Grants: there is no Northern Ireland grant for solar panels. The numbers work without one.
- Payback: about 5 years for a typical home, panels only, at today's Power NI rate of 34.15p per unit.
- Export: Power NI pays 9.64p per unit for what you send to the grid (2025/26 rate; Power NI sets a new rate each October).
Solar panel prices in Northern Ireland by system size
Every price below is a fully installed figure: panels, inverter, mounting, scaffolding, electrical work, the NIE Networks paperwork and MCS certification. They are typical Northern Ireland ranges for 2026 at 0% VAT, and our own quotes fall inside them. Several customers who gathered three quotes before choosing us say in their Google reviews that ours came in best like for like, which you can check for yourself. Your own quote will sit inside a range or slightly outside it for the reasons covered further down.
| System size | Panels (approx.) | Suits a home using | Panels only | With a 10kWh battery |
|---|---|---|---|---|
| 4.6kW | 10 panels | 2,500 to 3,500 kWh a year | £4,350 | £6,700 (10kWh) |
| 5.4kW | 12 panels | 3,500 to 5,500 kWh | £4,750 | £7,050 (10kWh) |
| 7.3kW | 16 panels | 5,500 kWh plus | £5,300 | £7,600 (10kWh) |
| 12kW | 26 panels | 7,000 kWh plus, EV or heat pump | £7,525 | £9,825 (10kWh) |
Panel counts assume 460W panels, which is what we fit as standard. Battery sizes are the ones we most often pair with each system; a bigger or smaller battery moves the "with a battery" figure by roughly £190 to £230 per kWh of battery.
Two things stand out in that table. The price per kilowatt falls as the system grows, because scaffolding, the inverter and the electrician's day are largely fixed costs. A 4.6kW system works out around £950 per kW, a 12kW system nearer £630. That is well below the national MCS installation data for 2025 to 2026, which shows the average cost of a UK domestic system falling from about £1,950 per kW below 4kW to about £1,650 per kW between 4kW and 10kW.
Does the price change across Northern Ireland?
Not much, and not because of the postcode. We quote the same way in Belfast, Lisburn, Newtownards and Bangor as we do in Derry, Omagh or Enniskillen: the roof sets the price, not the town. Where it can shift is access. A terraced house in south Belfast with no side access needs a scaffold from the street and a permit; a farmhouse outside Ballymena with a long scaffold run and a three-phase supply costs a little more on the day. Both are inside the ranges above.
And the battery is the biggest single decision. It adds roughly half again to the price of the panels: about £2,350 for a 10kWh battery on a 4.6kW system. Whether that is worth it depends on how much electricity you use after dark, which is why we look at your bills before we recommend one.
What the price includes
A proper solar quote in Northern Ireland should be one number that covers the whole job. Ours does. If you are comparing quotes, check that each of these is in the price and not an extra on the day:
- Panels and mounting. The panels, the rails and fixings, and the roofers to fit them. We use LONGi and JA Solar panels on Renusol mounting.
- Inverter. The box that turns DC from the roof into AC for your home. If you are adding a battery this is usually a hybrid inverter, which handles both.
- Scaffolding. Typically £400 to £800 of the total on a two-storey house. Bungalows are cheaper, three-storey townhouses dearer.
- Electrical work and commissioning. Cabling, isolators, consumer unit work, generation meter, and the test and commissioning certificate.
- NIE Networks connection. Systems up to 3.68kW are notified to NIE Networks under G98/NI after the install. Anything larger needs a G99/NI application approved before we start. We handle both. Our NIE Networks guide explains the difference.
- MCS certificate. Issued after commissioning. You need it to register for export payments with your electricity supplier.
- Monitoring. An app that shows generation, consumption and battery state on your phone.
One thing worth knowing about that list: at EECO every step of it is done by our own staff. We employ our roofers and electricians rather than subcontracting the job out, which is why we can put the whole thing in one number and stand behind it afterwards.
Where the money goes on a typical £4,350 4.6kW system: panels around 40%, labour around 25%, inverter around 15%, mounting around 10%, and scaffolding, wiring, certification and paperwork the rest.
What changes the price
Your roof
A plain pitched roof in concrete tile or slate, facing anywhere from south-east to south-west, with clear access for scaffolding, is the cheapest roof to work on. Costs rise with steep pitches, fragile slate, dormers and Velux windows that break up the array, and flat roofs that need angled frames (usually £300 to £500 extra). A roof split across two faces needs two strings or optimisers, which adds to the inverter cost.
Panel count, not just kilowatts
Two 4kW systems can differ by two panels depending on the panel wattage. Higher-wattage panels cost more each but need fewer of them, fewer fixings and less roof. On a small roof that is often the better buy.
Inverter choice
A string inverter is the standard and the cheapest. A hybrid inverter costs more but is the right choice if a battery is going in now or within a few years. Micro-inverters or optimisers on every panel add 20% to 30% to the inverter cost and only earn it back on roofs with real shading.
Battery size and brand
Covered below. This is the line that swings a quote by thousands.
The extras worth having
- Immersion diverter (we fit the iBoost). Sends spare solar into your hot water tank instead of the grid. Around £300 to £500 and pays back quickly if you heat water electrically or with oil.
- EV charger. A solar-aware charger that tops the car up from the roof. Priced separately on your quote.
- Bird proofing. Mesh around the array edge. Cheap on the day, expensive to retrofit.
Planning
Most homes in Northern Ireland do not need planning permission for roof-mounted solar. The panels must sit no more than 200mm proud of the roof and below the ridge. Listed buildings and conservation areas are the exception, and an application adds time rather than much cost. More on planning permission for solar in NI.
Want a price for your roof, not a range?
A free survey across Northern Ireland. We measure the roof, look at a year of bills, and quote one number that includes everything.
Battery storage costs in Northern Ireland
A battery stores the solar you do not use during the day so you can run the house on it in the evening. Without one, a working household typically uses 30% to 70% of what the roof makes, depending on who is home during the day, and exports the rest at the export rate. With one, that rises to 85% to 90%, and every unit you keep is worth 34.15p instead of 9.64p.
| Battery | Usable storage | Added to a solar install | Suits |
|---|---|---|---|
| Dyness | 10kWh or 16kWh | Priced on your quote | The typical family home, our most fitted battery |
| Soluna | 10kWh, 16kWh or 32kWh | Priced on your quote | Families through to very high usage |
| Tesla Powerwall 3 | 13.5kWh usable | £7,005, including the NIE application for its 7.6kW inverter | Larger homes, EV, heat pump, backup power |
Tesla Powerwall or a standard battery? Compare whole systems
A Powerwall 3 is the battery and the inverter in one unit, so it cannot be priced as a swap for another battery. The honest way to compare is a complete system against a complete system. Here is the same 11.94kW roof, 26 panels at 460W, priced both ways, each with the NIE G99 fast-track application included.
| Standard system | Tesla Powerwall 3 system | |
|---|---|---|
| Panels | 11.94kW, 26 × 460W | 11.94kW, 26 × 460W |
| Battery | 16kWh | Powerwall 3, 13.5kWh usable |
| Inverter | 6kW | 7.6kW, built into the Powerwall |
| NIE G99 fast-track application | Included | Included |
| Installed price | £10,525 | £12,875 |
The £2,350 difference buys a bigger inverter, Tesla’s backup power and app, and the Tesla name, and you give up 2.5kWh of storage against the 16kWh battery. For most homes the standard system is the better value; the Powerwall earns its price where backup power matters or an EV and heat pump are coming.
Installed alongside solar. Fitting a battery on its own to an existing system costs more because it needs its own inverter and a second visit; it is still 0% VAT.
We are a Tesla Powerwall certified installer and we fit more Dyness batteries than anything else. Both are lithium iron phosphate, both have built-in fire suppression and heat pads, both are warrantied for ten years, and both work with a night tariff: on Power NI Economy 7 you can fill the battery at 17.8p per unit after midnight in winter, when the roof is doing little, and run the house on that through the day. More on the Duracell home battery and our battery storage service.
What a typical Northern Ireland home gets back
Here is the arithmetic for an ordinary three-bedroom semi using around 3,400 kWh a year, which is close to the Power NI average. Nothing in it is optimistic.
A 4.6kW south-facing system in County Down generates about 3,400 kWh a year. This household is home for much of the day and uses about 70% of that directly: 2,380 kWh at 34.15p is £813 off the bill. The other 1,020 kWh is exported at 9.64p, which is £98 paid into the bank. Total benefit around £910 a year. On a £4,350 install that is a payback of about 4.8 years, with the panels warranted for 30.
Self-use rises to about 90%: 3,060 kWh kept at 34.15p is £1,045, plus 340 kWh exported for £33. Around £1,080 a year from solar alone. On a £6,700 install that is a payback of about 6.2 years. Fill the battery overnight on Power NI Economy 7 through the winter months, when the roof is doing little, and it earns roughly £150 a year more, bringing the payback nearer 5.5 years. The battery pays back more slowly than the panels on a modest bill, and much faster on a big one: a home using 6,000 kWh plus with an EV will keep nearly all of its solar and see the battery pay for itself far sooner.
Two honest caveats. Electricity prices in Northern Ireland have risen every year since 2021, and every rise shortens the payback, but we do not build that into our numbers. And export payments in NI are voluntary supplier tariffs reviewed every October, not a statutory scheme, so treat the export line as a bonus rather than a promise.
"My monthly bill is down 90%, from around £200 per month to £20 per month. It's had a huge impact on our family."
That kind of result comes from sizing the battery to the house and using the night tariff well, not from the panels alone. It is why our surveys start with your bills rather than your roof.
Grants, VAT and export payments in Northern Ireland
Grants: none for solar, and that is fine
There is no Northern Ireland government grant for domestic solar panels in 2026. The schemes that do exist, the Affordable Warmth Scheme and NISEP, fund insulation and heating for lower-income households in harder-to-heat homes; they do not pay for solar PV and their waiting lists are full. If a company tells you it can get you a solar grant in NI, ask which scheme, and expect a pause.
The reason the numbers still work is that the price of solar has fallen by around 70% in a decade. A 4kW system that cost £12,000 to £15,000 in 2014 costs under £5,000 today, and the electricity it replaces costs twice what it did.
0% VAT until 31 March 2027
Domestic solar panels, batteries and the labour to install them have been zero-rated for VAT in Northern Ireland since 1 May 2023. On a £6,700 solar and battery job that is £1,340 you are not paying. The relief is scheduled to end on 31 March 2027, after which the rate is expected to return to 5% unless the government extends it. Every price on this page is at 0%. Our 0% VAT explainer covers what qualifies.
Export payments: the NI version
Northern Ireland is not covered by the Smart Export Guarantee that applies in Great Britain. Instead, each NI electricity supplier offers its own microgeneration export tariff. Power NI's rate is 9.64p per unit for the year to 30 September 2026, approved by the Utility Regulator, with a new rate published each October. SSE Airtricity, Electric Ireland, Budget Energy and Click Energy publish their own. You need an MCS certificate and an export meter or smart meter, and we sort the paperwork as part of the install.
Running costs after the install
- Panels: nothing. Northern Ireland's rain keeps them clean; we have never had to send a cleaning crew to a pitched roof.
- Inverter: the one part with a shorter life. Budget for a replacement somewhere between year 10 and year 15, typically £800 to £1,500 at today's prices.
- Battery: warranted for ten years and designed for far longer. No servicing.
- Insurance: tell your home insurer. Most add solar at no extra premium.
- Aftercare: we are a Northern Ireland company based in Newtownards, with employed installers. If something needs looking at, you ring the office and someone who fitted it comes out. Our reviews mention that follow-up more than anything else.
How to get an accurate price
Ranges are useful for deciding whether to look into solar. They are no use for deciding which quote to sign. To price your home properly we need three things:
- Your roof. Orientation, pitch, size and shading. We measure it on the survey; you do not need to go up a ladder.
- A year of bills, or your annual kWh from your supplier's app. This decides the system size and whether a battery makes sense.
- How you live. Home during the day or out, electric car, oil or electric heating, plans for a heat pump. This decides the battery size.
From that we build a model of your roof and your usage in our design software, so before anyone climbs a ladder you can see how many panels fit, what the system should generate month by month, what that takes off your bill, and one price that includes everything on this page. The survey is free and there is no obligation, and there is no hard sell either: if the numbers do not work for your house we will say so, and more than one of our reviews says exactly that. Most installs are completed within two weeks of the deposit, and the roof work itself usually takes a day.
Get your free survey and quote
We cover every county in Northern Ireland. Tell us where you are and we'll book a time that suits.
Questions we get asked about solar costs in Northern Ireland
How much does a 4.6kW solar system cost in Northern Ireland?
Around £4,350 fully installed in 2026, with 0% VAT. Add around £2,350 for a 10kWh battery. The lower end is a simple roof with standard panels and a string inverter; the upper end is a harder roof, premium panels or a hybrid inverter ready for a battery.
Are solar panels worth it in Northern Ireland with our weather?
Yes. Panels run on light, not heat, and Northern Ireland gets 750 to 900 kWh a year for every kW installed. That is a little less than the south of England and more than most people expect. At 34.15p a unit for grid electricity, a typical system pays for itself in about five years and is warranted for 30.
Is there a solar panel grant in Northern Ireland?
No. There is no NI government grant for domestic solar in 2026. What you do get is 0% VAT on the whole installation until 31 March 2027, and export payments from your electricity supplier for the electricity you do not use.
How much can I save with solar panels in NI?
A typical home saves around £900 a year with a 4.6kW system and £1,100 to £1,250 with a battery added, at 2026 prices. Larger homes with an EV or heat pump save considerably more. Our customer Lynsey in Belfast cut her bill from around £200 a month to £20 with solar and a battery.
Do I need planning permission for solar panels in Northern Ireland?
Usually not. Roof-mounted panels are permitted development in NI provided they sit no more than 200mm above the roof surface and below the ridge line. Listed buildings and conservation areas need an application, which we can help with.
How long does a solar installation take?
The roof work is normally one day, with the electrical work and battery the same day or the next. From paying the deposit to a working system is typically two weeks or less. Systems over 3.68kW need NIE Networks G99/NI approval before we start, which we apply for as soon as you confirm.
Prices checked 22 September 2026 against current Northern Ireland installer pricing and MCS installation data. Power NI standard unit rate 34.15p incl. VAT from 1 July 2026; Power NI export rate 9.64p to 30 September 2026. We update this page when either changes.

Make the change toward clean renewables
Get Your FREE Quote Now
Fill out the form to start saving on your energy bills – take the first step today